Research and development facilities such as pharmaceutical companies require strict control of temperature, air quality and lighting in short, all environmental factors that can affect sensitive equipment used for experimental work. TAC keeps HVAC and security under control so the experts can concentrate on getting results. | ||||||||||||
| The solution developed and installed by FMC | |||||||||||||
| incorporated a wide range of third-party equipment from TAC, ABB, Echelon, Control By Light, The Watt Stopper, Continental Control Systems, Loytec and Vaisala. This interoperability gives the customer the features they need plus the ability to upgrade the system or add additional components with ease due to the "open" nature of LONWORKS technology. | |||||||||||||
|
Case Study #2 - Major Retail Chain
|
|||||||||||||
|
A discount clothing chain with 45 stores in 17 states installed
the Novar LOGIC ONE system to control lighting, heating, ventilation and air conditioning equipment throughout the
stores. Prior to installing the Novar system, the chain's average monthly electricity cost was $202,500. With Novar Advanced Building Controls, the average cost dropped to $166,500 per month - a savings of $36,000 a month. |
|
||||||||||||
|
Case Study #3 - Public School System
|
|||||||||||||
![]() |
A public school district installed Novar Advanced Building Controls to operate the mechanical systems in 29 schools and
an operations building. In less than a full school year, the system realized a $490,000 savings in utility costs. That represents a payback of a little over three years, rather than the five they expected. |
||||||||||||
|
Case Study #4 - Municipal/County Buildings
|
|||||||||||||
| Looking for ways to cut its energy costs, a local government selected Novar Advanced Building Controls for its administrative buildings, hospitals, clinics and jails. For the first year, a 38% energy reduction resulted in savings of $1.5 million. |
![]() |
||||||||||||
|
FMC Case Studies
Please allow time for the PDF to load , or right click and "save target as" |
|||||||||||||
|
Belmont Hill Case Study
Sepracor Case Study |
|||||||||||||
|
FMC Technologies, Inc.
24 Westech Drive Tyngsboro, MA 01879 Phone: 978-649-0145 Fax: 978-649-0148 |
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
||